MAIN STREET CONSTRUCTION – UPDATED 11/14/2022


Main Street will be closed from Water Street to 2nd Street for approx. 5 days.

Please check back for any updates.

ALT. Routes from Bridge:
-Turn Right on S. Water Street, Left onto Vine Street, utilizing S 4th Street to Main Street.
-Turn Left on N. Water Street, utilize any of the side streets on your right after crossing the Railroad crossing on N. Water.

ALT. Routes from S. Huntingdon Twp.
– Turning left on to any of the following: S. 6th St., S. 5th St, or S. 3rd St. to right on to Vine Street, crossing over Railroad tracks then, make right on to S. Water Street.
-Turning Right on N 2nd Street, make a left onto any of the following: Cross St., Poplar St., School St., or Robertson St. to access N. Water Street.

*Please be aware of any additional road closures, as Columbia Gas has been working on a Gas Line Project in the area – Thank you.

West Newton Borough


112 South Water Street
West Newton, PA 15089

724-872-6860

Office Hours
Monday - Friday
8:00am – 4:00pm.